EPC (Engineering, Procurement & Construction)
Introduction
• Introduction to the Pipeline Oil & Gas Transportation
• Overview Enginering Scope
• Overview Procurement Scope
• Overview Construction Scope
• Integrated Pipeline EPC Project
Key Topics
Pipeline for Oil & Gas Transportation
• Project Overview
• Project Setting
• Simple Project Team
• Membuat rencana biaya dan pengontrolan
• Membuat rencana mobilisasi
• Proqurement plan dan rencana pengiriman material
• Alokasi Key personil proyek
• Membuat detail schedule dari activitas bulanan, mingguan dan harian
• Melakukan detail survey ( apabila diperlukan )
Pipeline Enginering
• Line and Route Survey
• Road Crossing, River Crossing, Railway Crosing and Utility Crossing
• Material and support design
• Pipeline design
• Pipeline analysis
• Detail engineering
• Procurement Enginering and Procedures
• Prosedur koordinasi
• Jadwal detail pekerjaan ( Detail work schedule )
• Alignment sheet, detail drawing, isometric drawing dan shop drawing
• Spesifikasi peralatan dan material ( Equipments & Materials Specification )
• Material Take Off ( MTO )
• Vendors data book & drawing
• Inspection and Test Plan dan Inspection Test Report
• Operation Manual dan Program Pelatihan untuk pengoperasian peralatan
• As-built drawing
Procurement
- Pengadaan peralatan dan material yang akan dipasang disediakan oleh bagian Pengadaan ( Procurement ) berdasarkan daftar Material Take Off ( MTO ) yang disusun oleh bagian Engineering sesuai dengan gambar kerja , spesifikasi dan standar yang telah disetujui
- Factory Acceptance Test
- Beberapa bahan dan peralatan yang digunakan pada proyek terkadang harus dilengkapi sertifikat yang dikeluarkan oleh pabrik ( vendor ) ataupun instansi yang berwenang.
- Engineering dan Quality Assurance / Quality Controll ketepatan jadwal pengiriman, jumlah dan mutu peralatan ataupun material yang dikirim.
- Inspeksi terhadap peralatan dan material dilaksanakan berdasarkan jadwal pengiriman barang
- Prosedur Inspeksi
Construction
• Project Plan
• Project Quality Plan.
• Safety Performance
• Schedule dan Kontrol Proyek
• Persiapan dan Mobilisasi
• Transportasi dan Penempatan Material
• Stringing Pipa
• Bending
• Welding
• Field Joint Coating
• Trenching
• Penurunan pipa dan Menimbun Kembali
• Road Crossing
• River Crossing
• Swamp Crossing ( Crossing di Rawa )
• Cleaning Pipeline
• Hidrotest
• Dewatering dan Flushing
• Cathodic Protection
• Pekerjaan Civil, Structure dan Piping
• Pekerjaan Mechanical
Participant
Project Engineer, Piping Designer, Mechanical Engineers, Maintenance Enginers & Supervisor, Service Engineers & Supervisor, Work Over Engineers & Supervisor, Plant Engineers, Petroleum Engineers
Learning Method
Lecture, Case Study, Problem Solving
Trainer
Dana Persada , MBA , PMP® . Memiliki pengalaman lebih dari 25 tahun di bidang IT, Perbankan, Pemerintahan dan NGO. Karir dimulai Programmer, MIS Project Head dan banyak terlibat dalam project pemerintahan seperti di Mabes Polri, Pelindo, Puskud & Inkud dan dari 2000 aktif dalam pengajaran di berbagai Universitas di bidang manajemen proyek, teknologi komputer, resiko managemen dan sertified trainer untuk Management Proyek.
Ir. M. Tavip Sunandar, MM, PMP® . Memiliki pengalaman lebih dari 25 tahun di bidang Oil & Gas memulai karir di Arco dan British Petrolium di bidang Enggineering dan konstruksi Onshore – Offshore dan subsea Oil & Gas, Lulusan terbaik dari ITB untuk jurusan Chemical Enggineer. Dan sudah 8 tahun menjadi pengajar di industri oil dan gas seperti pertamina, vico, british petrolium, chevron. Saat ini juga terlibat dalam project-project gas procecing plant, turbo machines di industri oil & gas
Schedule
- 26-29 Juli 2010
- 4 Days (9am – 4.30pm)
Investment
- Rp. 4.500.000 Exc Vat 10%
Venue
- Jl Jend Gatot Subroto Kav 74-75